( Field Catalog, Upstate New York )

Issue No. 1, Autumn 2026

New York Clean Energy

A publication about clean power above the Mohawk and west of the Hudson

[ 01 ]

Top Story

Twenty winters on the ridge above Tug Hill

Since June 2006, 195 turbines have stood on the Tug Hill Plateau in Lewis County, turning the cold lake wind into roughly 322 megawatts of electricity. Our first story looks back at twenty seasons of snow, service roads, and steady output from one of the oldest large wind farms in the East.

Tug Hill is not a gentle place. The plateau east of Lake Ontario catches some of the heaviest snow in the state, on the order of two hundred inches in a hard winter, and it holds that snow for months. It is also one of the windiest stretches of ground in New York, which is why the ridge has been generating power for two decades while newer projects, on paper at least, keep trying to catch up with it.

Read the story
White wind turbines along a snowy ridgeline with bare maples and drifting snow squalls
Figure 01. Maple Ridge turbines above the snow line on the Tug Hill Plateau, where winter is the most productive season.
[ 02 ]

One Year, Three Flows

Catalog figure showing three flat curves of upstate wind, hydro, and solar output across a twelve-month field

Wind Hydro Solar

How the seasons shape upstate clean power: gusty wind in the cold months, steady hydro that rises with the spring runoff, and solar that peaks at midsummer. These curves show the typical pattern, not real measurements.

[ 03 ]

Stories

A concrete hydroelectric station on the emerald Niagara gorge with mist rising off the water

[ 02 ] North

The Niagara drum

The New York Power Authority's Robert Moses plant has run since 1961. A story on the gorge, the grid, and what relicensing means for the state's oldest clean workhorse. Coming soon.

Solar panels on a pasture before a red barn and silo under a hazy morning sky

[ 03 ] West

Dairy-farm arrays

Community solar leases on working farmland keep barns paid for and herds in hay. A story from the flat ground along Route 20. Coming soon.

Three-panel illustration of a turbine ridgeline motif repeated in pine, Niagara blue, and hay hues

[ 04 ] How We Work

How we put these stories together

Original illustrations, charts explained in plain language, and no number we cannot point to a source for.

[ 04 ]

How We Work

New York Clean Energy is a small independent publication about clean power in upstate New York. We read the public record, the project filings, siting board orders, and operator reports, and we write up what actually matters for the people who live near these projects. Where a number is uncertain, we say so on the page.

We stick to what we can verify: projects that are built, permitted, or formally proposed, and agencies and operators that publish what they do. We do not invent statistics, and every story lists its sources.

Three-panel illustration of a turbine ridgeline motif repeated in pine, Niagara blue, and hay hues
The same turbine ridgeline in three upstate moods: pine forest, Niagara water, and late-summer hay.
[ † ]

Latest entry

OCT 2026

Blenheim-Gilboa: the grid battery New York built in 1973

Before lithium, the state stored power by pumping water up a Schoharie County mountain.